| « | May 2012 | » | ||||
| Mo | Tu | We | Th | Fr | So | Su |
| 1 | 2 | 3 | 4 | 5 | 6 | |
| 7 | 8 | 9 | 10 | 11 | 12 | 13 |
| 14 | 15 | 16 | 17 | 18 | 19 | 20 |
| 21 | 22 | 23 | 24 | 25 | 26 | 27 |
| 28 | 29 | 30 | 31 | |||
Pěší zóna Cheb on Facebook
Press news - News from the building site 26.6.2009
News from the building site 26.6.2009
Setting the planting baskets in total amount 5 pieces in the lower part of the pedestrian zone (from the former Bata store to Czech Savings bank) was finished last week. Water measuring shaft covered by paved cover will be used for water control by Chevak and it is already being built together with drainage. Surely pleasant news is, that paving the pedestrian zone is being done. Foundaments for the mobiliary (benches, litter bins, billboards etc.) are finished.


