| « | May 2012 | » | ||||
| Mo | Tu | We | Th | Fr | So | Su |
| 1 | 2 | 3 | 4 | 5 | 6 | |
| 7 | 8 | 9 | 10 | 11 | 12 | 13 |
| 14 | 15 | 16 | 17 | 18 | 19 | 20 |
| 21 | 22 | 23 | 24 | 25 | 26 | 27 |
| 28 | 29 | 30 | 31 | |||
Pěší zóna Cheb on Facebook
Press news - News from the building site 24.7.2009
News from the building site 24.7.2009
In addition to small size paving a kind of large size paving started to be laid, which will be a part of a small "square" in the neighbourhood of the crossroad of the pedestrian zone and Majova Street (the next one will be near to the department store Prior). A steel plate separating these two types of paving was set. Ground lighting spots were installed near the planting baskets which will lighten the trees in the evenings. Electric wires extension was finished and soon an electric pillar will be laid as a power pannel for public lighting, traffic lights etc. Work on eco-drainage will be finished next week and setting curbs at the pedestrian crossing (border of Majova and Svobody Street) will start.


