« Mai 2012 »
Mo Di Mi Do Fr Sa So
  1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30 31
virtuální prohlídka
Pěší zóna Cheb on Facebook

Pressenachrichten - News from the building site 28.5. 2009

News from the building site 28.5. 2009

The work now is predominantly concentrated on the pavement opposite Česká spořitelna (Savings Bank). Public lighting in this part is finished in one half and alterations on particular construction layers of this pavement are being finished, too. The planting baskets are set with exception of the last three which will appear in their place soon. During the next weeks the construction will be focusing on drainage channel. The channel will pass through the middle of the pedestrian zone in order to catch the water from the whole surrounding paving. The cover of the channel (metal belt) will turn into time axis with significant historical dates related to the town of Cheb. The installation will start from the end (2011: 950 year passed from the first written mention of Cheb) - in the level of former Bata store. In that year the last, third period of reconstruction will be completed.

zurück

_TOP druck