- On-line kamera
- umělecké dílo - brána času
- Kniha hostů
- Fotogalerie
| « | Květen 2012 | » | ||||
| Po | Út | St | Čt | Pá | So | Ne |
| 1 | 2 | 3 | 4 | 5 | 6 | |
| 7 | 8 | 9 | 10 | 11 | 12 | 13 |
| 14 | 15 | 16 | 17 | 18 | 19 | 20 |
| 21 | 22 | 23 | 24 | 25 | 26 | 27 |
| 28 | 29 | 30 | 31 | |||
Myslíte si, že i díky nové pěší zóně budou návštěvníci našeho města na Cheb rádi vzpomínat?
Ano
[46%] [12]
Ne
[35%] [9]
Nevím
[19%] [5]
Počet hlasů: 26
Pěší zóna Cheb on Facebook
Tiskové zprávy - Inspectional day in the construction site - 2.4.2009
Inspectional day in the construction site - 2.4.2009
The first period construction work is in the first thirdth of its volume. Storm sewer and English courts are being prepared, setting the 21 planting baskets started, which will be situated below the pavement surface. Each is 5 m long, 2 m wide and 1,6 m deep and will avoid growing the roots through the newly built pavement. Street lighting is in preparation and flexes for the Internet are being laid.


